Question: Given the cost elements in the table below, determine the total percentage in each of the four major quality-cost categories. Cost Element Amount ($) Incoming
Given the cost elements in the table below, determine the total percentage in each of the four major quality-cost categories.
Cost Element Amount ($) Incoming test and inspection 7,500 Scrap 35,000 Quality training 0 Inspection 25,000 Test 5,000 Adjustment cost of complaints 21,250 Quality audits 2,500 Maintenance of tools and dies 9,200 Quality control administration 5,000 Laboratory testing 1,250 Design of quality assurance equipment 1,250 Material testing and inspection 1,250 Rework 70,000 Quality problem solving by product engineers 11,250 Inspection equipment calibration 2,500 Writing procedures and instructions 2,500 Laboratory services 2,500 Rework due to vendor faults 17,500 Correcting imperfections 6,250 Setup for test and inspection 10,750 Formal complaints to vendors 10,000
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts