Question: Given the cost elements in the table below, determine the total percentage in each of the four major quality-cost categories. Cost Element Incoming test and
Given the cost elements in the table below, determine the total percentage in each of the four major quality-cost categories.
Cost Element Incoming test and inspection Scrap Quality training Inspection Test Adjustment cost of complaints Quality audits Maintenance of tools and dies Quality control administration Laboratory testing Design of quality assurance equipment Material testing and inspection Rework Quality problem solving by product engineers Inspection equipment calibration Writing procedures and instructions Laboratory services Rework due to vendor faults Correcting imperfections Setup for test and inspection Formal complaints to vendors Amount ($) 7,500 35,000 0 25,000 5,000 21,250 2,500 9,200 5,000 1,250 1,250 1,250 70,000 11,250 2,500 2,500 2,500 17,500 6,250 10,750 10,000
Step by Step Solution
3.35 Rating (161 Votes )
There are 3 Steps involved in it
The key to this problem is correct identification of the proper categories Ap... View full answer
Get step-by-step solutions from verified subject matter experts