Question: Given the data below for construction project, based on a PERT analysis: - What is the expected project duration [ 1 5 Points ] ?

Given the data below for construction project, based on a PERT analysis:
- What is the expected project duration [15 Points]? Show your calculation on the network
- Determine the probability of finishing the project in:
(a) In longer than +2 days [5 Points],(b) between more than +2 and less than +4 days [5 Marks].
- What is the project duration with probability of (70%)[5 Marks].
Given the data below for construction project,

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!