Question: Given the data below for construction project, based on a PERT analysis: - What is the expected project duration [ 1 5 Points ] ?
Given the data below for construction project, based on a PERT analysis:
What is the expected project duration Points Show your calculation on the network
Determine the probability of finishing the project in:
a In longer than days Pointsb between more than and less than days Marks
What is the project duration with probability of Marks