Question: Given the project network and baseline information below, complete the form to develop status reports for periods 14. Report the final SV, CV, CPI, and


Given the project network and baseline information below, complete the form to develop status reports for periods 14. Report the final SV, CV, CPI, and PCIB | 24 | 4 012 1 1 1 2 3 - 1 1 325 023 576 0 355 0 |3|2|5 0 0 0 51 16 0 3 3 LEGEND ESID EF 32 0 0 22 26 5 o 0 235 SL SL LS DUR LF WP LF 1 2 3 Schedule information Baseline budget needs (5000) DUR ES Total Time period SL PV O 1 2 3 4 5 6 2 0 3 1 12 48 3 3 0 15 375 2 2 0 8 44 2 2 5 1 6 33 2. 3 5 0 10 64 3 2 5 9 333 1 5 60 5 5 Total PV by period 11 19 11 1275 Cumulative PV by period 11 30 41 53 60 65 4 WINNNw OONIMIN | 5 Olo 6 7 Answer is complete but not entirely correct. AC PV SPI 11.00 1.48 1.09 Performance Indexes Summary Period EV 1 16.30 2 28.10 3 37.25 4 49.80 15.00 35.00 30.00 0.94 OOOOO olololo >> 0.80 0.79 PCI-B 25.08 X 43.23 X 57.31 X 76.82 X 47.00 41.00 0.91 0.94 60.00 53.00 0.83 EACE 78.31 VACE (13.31)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
