Question: Group technology requires that: a . the final products be standardized. b . engineering change notices be linked to each of the bills of material
Group technology requires that:
a the final products be standardized.
b engineering change notices be linked to each of the bills of material and engineering notices.
c a specific series of engineering drawings be prepared.
d each component be identified by a coding scheme that specities size, shape, and the type of processing.
e all bills of material be prepared using the same format.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
