Question: Group technology requires that: a . the final products be standardized. b . engineering change notices be linked to each of the bills of material

Group technology requires that:
a. the final products be standardized.
b. engineering change notices be linked to each of the bills of material and engineering notices.
c. a specific series of engineering drawings be prepared.
d. each component be identified by a coding scheme that specities size, shape, and the type of processing.
e. all bills of material be prepared using the same format.
 Group technology requires that: a. the final products be standardized. b.