Question: GS 9. Using the FCFS method, determine the (a)job sequence(b) flow time, (c) average tardiness, and (d) number of jobs at the work centerfor the

GS 9. Using the FCFS method, determine the (a)job sequence(b) flow time, (c) average tardiness, and (d) number of jobs at the work centerfor the data given below JOB PROCESSING TIME (DAYS) DUE DATE A 14 4 oo 25 12 C 10 10 D 25 20 E 10 15 10. Use Johnson Rule find the make span and the idle time Job Machine A Machine B A 4 15 12 2 B C 5 8 6 7