Question: a problem with 6 jobs ( A thru F). Sequence the jobs according FCFS, SPT, EDD, and CR.Post answers for Avg flow time, Avg tardiness,
a problem with 6 jobs ( A thru F). Sequence the jobs according FCFS, SPT, EDD, and CR.Post answers for Avg flow time, Avg tardiness, and Avg # jobs in the attached answer form. Scheduling for CR is C F A E B D.

Processing times (including setup times) and due dates for six jobs waiting to be processed at a work center are given in the following table. Determine the sequence of jobs, the average flow time, average tardiness, and average number of jobs at the work center, for each of these rules: a. FCFS b. SPT C. EDD d. CR Due Processing Date (days from Job Time (days) present time) 16 17 15 12 18 Assume jobs arrived in the order shown
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts