Question: H . W 1 / For the plan and section of the wall shown below. Calculate quantities for each of the following construction works: Excavation
HW
For the plan and section of the wall shown below. Calculate quantities for each of the following construction works:
Excavation works for foundation.
All concrete works from foundation to the root, take in consideration that there is a continuous tie beam.
Brick works under above the DPC level up to the parapet wall
Construction Metheds A Estimation
th stage
Dr Hassan issa
Dr Allaa Hamadi
Lect. Mustafa Ayad
lan
tableWidth mHeight mDWW
For the plan hexagon shape and section of the wall shown in No Calculate quantities for each of the following construction works:
Excavation works for foundation.
Brick works under above the DPC level up to the parapet wall
tableWidth Height
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock