Question: H . W 1 / For the plan and section of the wall shown below. Calculate quantities for each of the following construction works: Excavation

H.W
1/ For the plan and section of the wall shown below. Calculate quantities for each of the following construction works:
Excavation works for foundation.
All concrete works from foundation to the root, take in consideration that there is a continuous tie beam.
Brick works (under 8 above the D.P.C level up to the parapet wall).
Construction Metheds A. Estimation
4th stage
Dr. Hassan issa
Dr. Allaa Hamadi
Lect. Mustafa Ayad
?-lan
\table[[,Width (m),Height (m)],[D,1,2],[W1,2,1.5],[W2,1.5,1.5]]
2/ For the plan (hexagon shape) and section of the wall shown in No.1. Calculate quantities for each of the following construction works:
1- Excavation works for foundation.
2. Brick works (under 8 above the D.P.C level up to the parapet wall).
\table[[,Width (m),Height (m)
H . W 1 / For the plan and section of the wall

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!