Question: Hello, could you please help with with this question? 4. Using RS Means Building Construction Cost Data complete the following table. (Hint: some items might

Hello, could you please help with with this question?
Hello, could you please help with with this question? 4. Using RS

4. Using RS Means Building Construction Cost Data complete the following table. (Hint: some items might involve more than one line item from RS Means). Use "Building Construction" cost data, "Open Shop," set location to "Miami, FL," and use the Year 2020 release. Bare Unit Cost Daily Total Cost Item Number Description Qty. Unit Mat Output Labor Equip Crew 1 . Ea Rent of a 500 12office trailer, fumished including air conditioning and with no hookups Forms-in-place for concrete grade beams using job-built plywood (assume 3 use) Furnish and install in-place reinforcement steel bars (Grade 60) for elevated slabs (14 to #7) 400 SFCA 1.2 ton 4 high. 11.gauge, temporary chain link fence 900 LF GRAND TOTAL 4. Using RS Means Building Construction Cost Data complete the following table. (Hint: some items might involve more than one line item from RS Means). Use "Building Construction" cost data, "Open Shop," set location to "Miami, FL," and use the Year 2020 release. Bare Unit Cost Daily Total Cost Item Number Description Qty. Unit Mat Output Labor Equip Crew 1 . Ea Rent of a 500 12office trailer, fumished including air conditioning and with no hookups Forms-in-place for concrete grade beams using job-built plywood (assume 3 use) Furnish and install in-place reinforcement steel bars (Grade 60) for elevated slabs (14 to #7) 400 SFCA 1.2 ton 4 high. 11.gauge, temporary chain link fence 900 LF GRAND TOTAL

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!