Hello! I need help calculating the finish dates for this stadium project (see below).

Hello! I need help calculating the finish datesHello! I need help calculating the finish dates

I need help calculating the finish dates

Hello! I need help calculating the finish dates

The G&E Company is preparing a bid to build the new 47,000-seat Ventura baseball stadium. The construction must start on June 10, 2019, and be completed in time for the start of the 2022 season. A penalty clause of $500,000 per day of delay beyond April 3rd is written into the contract. Given the information provided in Table 6.3, construct a network schedule for the stadium project and answer the following questions: Technical Details for the Ventura Baseball Stadium The baseball stadium is an outdoor structure with a retractable roof. The project begins with clearing the site, an activity that lasts 60 days. Once the site is clear, work can start simultaneously on the structure itself and demolition of an adjacent building site. This demolition is necessary to create a construction stage for storing materials and equipment. It will take 30 days to demolish the buildings and another 30 days to set up the construction site. The work on the stadium begins by driving 160 support pilings, which will take 120 days. Next comes the pouring of the lower concrete bowl (120 days). Once this is done and the construction site has been set up, then the pouring of the main concourse (120 days), installation of the playing field (90 days), and construction of the upper steel bowl can occur (120 days). Once the concourse and upper bowl are completed, work can start simultaneously on building the luxury boxes (90days), installing the seats (140 days), installing the Jumbotron (30 days), and installing the stadium infrastructure (120 days), which includes bathrooms, lockers, restaurants, etc. Once the seats are installed, then the steel canopy can be constructed (75 days), followed by installation of the lights (30days). I The retractable roof represents the most significant technical challenge to the project. Building the roof track supports (90 days) can begin after the lower concrete bowl is constructed. At this time the dimensions of the roof can be finalized and the construction of the roof at a separate site can begin (180 days). After the roof supports are completed, then the roof tracks can be installed (90 days). Once the tracks and roof are completed, then the roof can be installed and made operational (90 days). Once all activities are completed, it will take 20 days to inspect the stadium. For purposes of this case assume the following: 1. The following holidays are observed: January 1, Martin Luther King Day (third Monday in January), Memorial Day (last Monday in May), July 4th, Labor Day(first Monday in September), Thanksgiving Day (fourth Thursday in November), December 25 and 26. 2. If a holiday falls on a Saturday, Friday will be given as an extra day off, and if it falls on a Sunday, Monday will be given as a day off. 3. The construction crew works Monday through Friday B D E F G H J ID -- 30 days 120 days Baseball Stadium Activity Duration Start Finish Predecessors 6/10/2019 2/23/2022 2 Clear stadium site 60 days 6/10/2019 8/10/2019 3 Demolish building 6/10/2019 7/10/2019 2 4 Set up construction site 30 days 6/10/2019 7/10/2019 3 5 Drive support piling 120 days 6/10/20199/10/20192 6 Pour lower concrete bowl 6/10/2019 9/10/2019 5 7 Pour main concourse 120 days 6/10/2019 9/10/2019 4,6 8 Install playing field 90 days 6/11/2019 4,6 9 Construct upper steel bowl 120 days 6/12/2019 4,6 10 Install seats 140 days 6/13/2019 7,9 11 Build luxury boxes 90 da 6/14/2019 7,9 12 Install jumbotron 30 days 6/15/2019 7,9 13 Stadium infrastructure 120 days 6/16/2019 7,9 14 Construct steel canopy 75 days 6/17/2019 10 15 Light installation 30 days 6/18/2019 14 16 Build roof supports 90 days 6/19/2019 6 17 Construct roof 180 days 6/20/2019 16 18 Install roof tracks 90 days 6/21/2019 16 19 Install roof 90 days 6/22/2019 17. 18 20 Inspection 20 days 6/23/2019 8, 11, 13, 15, 19

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!