Question: HELP! QUESTIONS: The activity cost table The budgeted Cost table using Earliest Start Times The Monitoring and Controlling Budgeted Cost table up to 75% of


HELP! QUESTIONS:
The activity cost table
The budgeted Cost table using Earliest Start Times
The Monitoring and Controlling Budgeted Cost table up to 75% of the expected duration of the project.
The project Crashing table.
(please use reasonable values for the above to solve)
t 2 3 4 4 Activity ID A B D E F G . 1 J Activity Details Predecessol Install Siding None Frame walls and roof None Install Plumbing None Install Gutters and downspouts A Lay Flooring B Install Electrical B Install Wallboard C Do interior Planning DE Install interior fixtures F G Do grading and Landscaping HI 1 2 3 4 1 3 5 8 4 0.5 2 3 4 5 3 4 6 9 5 1 b 3 4 5 12 5 11 13 10 3 5 7 9 5 1 45 variance Standard Deviation 0.1111 0.333333333 0.1111 0.333333333 0.1111 0.333333333 1.7778 1.333333333 0.4444 0.666666667 1.7778 1.333333333 1.7778 1.333333333 0.1111 0.333333333 0.1111 0.333333333 0.0278 0.166666667 1.471960144) 1.5 18 weeks to finish 125% of 18 is 22.5 3.396831102 The probability of finishing the project with less than 125% of the expected duration of according the the table the project is 99.965% Activity ID Activity Details ES EF LS LF The probability of finishing the project with less than 75% of the expected duration of the project is 1- The probability of finishing the project with less than 125% of the expected duration of the project 0.0351 A B C D E F Install Siding Frame walls and roof Install Plumbing Install Gutters and downspouts Lay Flooring Install Electrical Install Wallboard Do interior Planning Install interior fixtures Do grading and Landscaping 0 0 0 2 3 3 4 8 8 17 2 3 4 8 6 8 8 11 17 16 18 0 0 0 2 5 5 5 8 12 17 2 5 5 8 8 12 12 17 17 18 G H 1 J PATH A-D-H-J B-E-H-J B-F-I-J C-G-I-J Expected Time 18 16 14 17 Variance 2.03 0.69 2.03 2.03 Std Dev 1.42 0.83 1.43 1.42 Critical Path= A-D-H-J Project Completion Time - 18 weeks 1201 1 Page No. Date $10 2 STED olo 1811910 $ WIR ostetos w stol 170 ST. 171181 START LOB 13 135 8 a N STAL ST=1 1951 TIS
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts