Question: The budgeted Cost table The budgeted Cost table using Earliest Start Times The Monitoring and Controlling Budgeted Cost table up to 75% of the expected

The budgeted Cost table The budgeted Cost table using Earliest Start Times
The Monitoring and Controlling Budgeted Cost table up to 75% of the expected duration of the project.
The project Crashing table.
(use reasonable values as costs)
ES Activity ID EF SL LS duration LF 2D 8 0 2 6 8 8H17 01A2 . 81 917 022 3 E 6 2 51 31 8 17 18 0 Finish OB31 Start 17 1 18 2 35 3F 8 4 01C4 7 5 12 111 16 1 12 5 171 11 4 5 4G 11 1 5 712 Activity ID B - C E F G . 1 J Activity Details Predecesso Install Siding None Frame walls and roof None Install Plumbing None Install Gutters and downspouts A Lay Flooring B Install Electrical B Install Wallboard C Do interior Planning DE Install interior fixtures F G Do grading and Landscaping HI 1 2 3 4 1 3 5 8 4 0.5 2 3 4 5 3 4 6 9 5 1 b 3 4 5 12 5 11 13 10 6 1.5 t 2 3 4 6 3 5 7 9 5 1 45 variance Standard Deviation 0.1111 0.333333333 0.1111 0.333333333 0.1111 0.333333333 1.7778 1.333333333 0.4444 0.666666667 1.7778 1.333333333 1.7778 1.333333333 0.1111 0.333333333 0.1111 0.333333333 0.0278 0.166666667 1.471960144) Activity ID Activity Details ES EF LS LF A B C 006 E F G H 1 J Install Siding Frame walls and roof Install Plumbing Install Gutters and downspouts Lay Flooring Install Electrical Install Wallboard Do interior Planning Install interior fixtures Do grading and Landscaping 0 0 0 2 3 3 4 8 8 17 2 3 4 8 6 8 11 17 16 18 0 0 0 2 5 5 5 8 12 17 2 5 5 8 8 12 12 17 17 18 PATH A-D-H-J B-E-H-J B-F-I-J C-G-I-J Expected Time 18 16 14 17 Variance 2.03 0.69 2.03 2.03 Std Dev 1.42 0.83 1.43 1.42 Critical Path= A-D-H-J Project Completion Time = 18 weeksStep by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts