Question: Help with part C Vemon Inc, has analyzed the setup time on its computer-controlled lathe. The setup requires changing the type of fixture that holds

Vemon Inc, has analyzed the setup time on its computer-controlled lathe. The setup requires changing the type of fixture that holds a part. The average setup time has been 140 minutes, consisting of the following steps: a. A company plans to setup a machine to increase the productivity. The average setup time is 140 minutes. Do you think the management needs to minimize the setup time. Identify the reason that supports the answer. a. Yes b. No a. The setup time is not a concern of the company as it is not related to productivity of the company. b. The setup time should be considered because long setup time leads to increased economic cost of the setup. c. The cost incurred for setup can be ignored as it is related to machinery. d. Long setup cost can be recovered as depreciation. b. A company plans to setup a machine to increase the productivity. The average setup time is 140 minutes. The company wishes to control the setup time. Identify the statement that suits the given situation. a. Identify the wait time and non-value-added time and eliminate that with effective planning so that the setup time can be reduced. b. Identify the machine that has less setup time. c. Identify the laborers are contributing less to the setup process and eliminate them from the process. d. None of the above. c. How much time would be required for a setup, using your suggestion in (b)? minutes
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
