Question: Hi, may you help me with the question attached below? Thanks. Consider a factory that runs one shift per day from 7:00 a.m. to 3:00

Hi, may you help me with the question attached below? Thanks.

Hi, may you help me with the question attached

Consider a factory that runs one shift per day from 7:00 a.m. to 3:00 p.m. Operators are provided two 15 minute paid coffee breaks and one 30 minute unpaid lunch break. On the day that you observed, the machine was down three times; an equipment jammed that caused 11 minutes of downtime; a power outage caused 9 minutes of downtime and a parts shortage caused 6 minutes of downtime. At the end of the day there were 1367 parts produced of which 78 were rejected. The equipment manufacturer claims the running speed for the machine is 15 seconds per cycle but that is with a feeder attached and you did not buy that accessory, choosing instead to manually feed parts in. By manually feeding, your cycle time is more than 15 seconds. What is the measure of Performance for this machine? O 0.92 O 0.77 0.84 O 0.87

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!