Question: hi please help me do this question 4 and 5. please help me fill this chart with crash times and cost . Please answer it

hi please help me do this question 4 and 5.
please help me fill this chart with crash times and cost .
Please answer it real quick
thanks hi please help me do this question 4 and 5.
hi please help me do this question 4 and 5.
hi please help me do this question 4 and 5.
hi please help me do this question 4 and 5.
hi please help me do this question 4 and 5.
hi please help me do this question 4 and 5.
4. Refer to the blank Chart with Crash Times and Costs! You have a template. You can modify it to your case, and fill it in with all the information needed. You have been given the chart with Network Activity chart (ID, Description, Duration Predecessor). Transpose the information from the Network Activity Chart to the Chart with. Crash Times and Costs, and contimue to fill in the chart. (10 points) 5. Use the crash time and cost information to construct a second AON network diagram to calculate the LEAST COST of finishing the project by the new date. The yellow highlights are the activities for you to crash. ( 13 points) Technical Detail Description The Stadium is an outdoor structure with a retractable roof The project begins with clearing the site (70 days.) Once the site is clear, work can start simultaneously on demolishing an adjacent building (20 days), and selting up the construction site (50 days). This demolition is necessary to create a temporary warehouse ( 30 days) for seating. lighting and infrastructure materials The work on the stadium begins by driving 160 support pilings (120 days) Next comes the pouring of the lower concrete bow (120 days) Then the pouring of the main concourse (120 days), the installation of the playing field ( 90 days), and the construction of the upper steel bowl (120 days) can proceed in parallel, not in sequence After the concourse, upper bowl and temporary construction storage area are completed, work can start simultanoously on instaling the seats ( 140 days), building the luxury boxez ( 90 days), installing the Jumbo Scoreboard (30 days), and installing the stadum infrastructure (120 days) which includes bathrooms, lockers: restaurants, dressing rooms, media rooms, etc Once the seats are installed then the steel canopy can be constructed (75 days) followed by the installation of the fighting and sound systems ( 30 days). The retractable roof represents the most significant technical challenge to the project Buiding the roof track supports (80 days) can begin after the lower concrete bow is constructed After this, confirmation of the dimensions of the roof (10 days) can be finalized and the construction of the roof ( 180 days) at a separate site can begin After the roof supports are completed then the roof tracks can be instalied (90 days) Once the tracks and the roof are completed then the roof can be frucked in (5 days), and roof tracks instaled ( 90 days) Finally, the roof will be instaked (90 days) After all the construction activities are compteted the stadium will be ready for inspection (20 days) For purposes of this assignment you can assume the following: 1 The following holidays are observed. January 1st, Good Friday, Victoria Day, Canada Day July 1st, Labour Day the first Monday in September, Thanksgiving Day the second Monday in October, and December 25th and 26th 2. The construction crew work Monday through Friday from 7 am until 5 pm Group Project #3-Chart with Crash Times and Costs - BLANK (2) Q i+ ot 1+ Commonwealth Stadium- Chart with crash Times and Costs "Fill in all the blanks as per your Network Activity Chart and complete the above $ amounts

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!