Question: High-Level Requirements: 1. For this project in Assignment #3, some tasks are missing and their sizes along with their corresponding productivity rates are unknown. 2.


High-Level Requirements: 1. For this project in Assignment #3, some tasks are missing and their sizes along with their corresponding productivity rates are unknown. 2. Use the productivity rates used in Assignment #1 and Assignment #2 to establish a baseline (the average of productivity rates for Assignment #1 and Assignment #2) for the Productivity Rates of Assignment #3 3. Use the size data for the different tasks used in Assignment #1 and Assignment #2 to establish a baseline (the average size data for Assignment #1 and Assignment #2) as Estimates for the Size data of Assignment #3 4. Consider WBS for Assignment #1 and Assignment #2 to identity the activities and tasks for Assignment #3. 5. Use sound software engineering judgments for creating new tasks and
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts