Question: HIGHLIGHT/BOLD answers will vote A linear programming computer package is needed. Greenville Cabinets recelved a contract to produce cabinets for a major fumiture distributor. The
A linear programming computer package is needed. Greenville Cabinets recelved a contract to produce cabinets for a major fumiture distributor. The contract calls for the production of 3,300 small cabinets and 4,100 large over the next two months, with the following delivery schedule Greenville estimates that the production bime for each 5 mall cabinet is 0.7 hours and the production time for each large cabinet is 1 hour. The raw material costs are $10 for each small cabinet and $12 for each large cabinet. Labor costs are $22 per hour using regular production time and $33 using overtime. Greenville has up to 2,400 hours of regular production time avallable each month and up to 1,000 additional hours of overtime available each month. If production for either cabinet exceeds demand in month 1, the cabinets can be stored at a cost of $5 per cabinet. For each produch, determine the number of units that should be manufactured each month on regular time and on overtime to minimize total production and storage costs. (Round your answers to the nearest integer. Let SaR = regular small cabinets for month 1 , SbR a regular small cabinets for month 2, LaR = regular large cabinets for month 1, LbR = regular large cabinets for month 2, 5a0= overtime small cabinets for month 1, 5 bO = overtime small cabinets for month 2, LaO= overtime large cabinets for month 1, and LbO= overtime large cabinets for month 2) (SaR,SbR,Laf,LbR,5aO,5bO,LaO,LbO)=(C) Total Production Cost =5
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts