Question: Home Work Assignment Due: Sept 22nd, 2020 a) Construct a multiple activity chart. 2 machine and 1 operator b) What is the transient time? c)

Home Work Assignment Due: Sept 22nd, 2020 a) Construct a multiple activity chart. 2 machine and 1 operator b) What is the transient time? c) Determine the cycle length (cycle time). Loading: 1 min d) Determine machine idle time during a Machine automated operating repeating cycle time: 12 min Determine operator idle time during a repeating cycle Traveling time: 1 min ) Determine ideal machine assignment Unloading: 1 min g) Calculate if you assign nearest integer number of machines that is greater than ideal Inspecting and Packing: 1 min h) Calculate if you assign nearest integer number of machines that is less than ideal 1) Compare costs and what would be your recommendation O . Home Work Assignment Due: Sept 22nd, 2020 a) Construct a multiple activity chart. 2 machine and 1 operator b) What is the transient time? c) Determine the cycle length (cycle time). Loading: 1 min d) Determine machine idle time during a Machine automated operating repeating cycle time: 12 min Determine operator idle time during a repeating cycle Traveling time: 1 min ) Determine ideal machine assignment Unloading: 1 min g) Calculate if you assign nearest integer number of machines that is greater than ideal Inspecting and Packing: 1 min h) Calculate if you assign nearest integer number of machines that is less than ideal 1) Compare costs and what would be your recommendation O
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
