Question: Homework:Homework 2 - Process Design Question 1, Problem 7.5 HW Score: 0%, 0 of 20 points Points: 0 of 2 Save Doha Toy Shop, Inc.,
Homework:Homework 2 - Process Design
Question 1, Problem 7.5
HW Score: 0%, 0 of 20 points
Points: 0 of 2
Save
Doha Toy Shop, Inc., has a 1-year contract for the production of
200,000
parts for a new toy. Owner Jasem Al-Ali hopes the contract will be extended and the volume increased next year. Doha has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow:
| General-Purpose Equipment (GPE) | Flexible Manufacturing System (FMS) | Dedicated Machine (DM) | |
| Annual contracted units | 200,000 | 200,000 | 200,000 |
| Annual fixed cost | $125,000 | $200,000 | $500,000 |
| Per unit variable cost | $15.00 | $14.00 | $13.50 |
Based on the cost, the process that is best suited for the current contracted volume is
.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
