Question: how activate AVAC control in WBS level 3 if the WBS level 3 does not have budget assigned? the budges is assigned until level 2

how activate AVAC control in WBS level 3 if the WBS level 3 does not have budget assigned? the budges is assigned until level 2 in CJ30