Question: How are the work breakdown structure and change control connected? Question 2 0 options: The WBS has connection to RBS Change control is a subset

How are the work breakdown structure and change control connected?
Question 20 options:
The WBS has connection to RBS
Change control is a subset of the WBS planning
connected via Finished to Start precedence relationship
they are indirectly linked
they are directly linked