Question: How do I develop a CPM network and determine the critical path for the events defined in the Gantt chart below? Events Problem delinition (2)
How do I develop a CPM network and determine the critical path for the events defined in the Gantt chart below?

Events Problem delinition (2) Market analysis (3) Specifications (4) Function analysis (5) Design concepts 6) Detail drawings (7) Prototype construction (8) Prototype testing (9) Prototype analysis (10) Feasibility analysis (11) Sales analysis (12) Product launching