Question: How to solve 4 G Il . elearning.ju . edu.jo task, prone to a lot of errors. At this point, the need for a specific

How to solve
4G Il.
elearning.ju.edu.jo
task, prone to a lot of errors. At this point, the need for a specific algorithm for crashing a schedule is needed, as well as a preliminary programmed sample.
Analysis And Algorithm
The Traditional Crashing Method
The most basic and correct crashing method is the manual method, where activities are crashed on a day-by-day basis. This method, although resulting in correct results, is very time-consuming and can create an obstacle for project managers with limited time. The basic information needed to perform this method are five items, along with the project network diagram. First, the project manager needs to prepare a list of the activities, with the following attributes for each activity: normal cost, normal duration, crash cost, and crash duration. To determine the normal duration and the crashed duration, he must determine the budgeted quantity of work as well as the normal rate of productivity and the maximum rate of productivity. Then, he calculates the durations according to the following formulas (1) and (2).
Normal Duration =BudgetedQuantityNormalRateofProductivity
Crahsed Duration =BudgetedQuantityMaximumRateofProductivity
3
Afterward, the slope is calculated, which is the daily increase in an activity cost. This slope is calculated using the formula:
Slope =CrashedCost-NormalCostNormalDuration-CrashedDuration
Furthermore, when crashing the project, a new set of critical paths may emerge and the crashing procedure needs to take those new critical paths into consideration. On the other hand, when crashing an ongoing project schedule, the project manager will follow the same instructions discussed above, but with one major difference. An ongoing schedule has completion percentages for activities, and therefore the originally schedule durations should be replaced by remaining durations, and the crash duration shall be multiplied by the remaining percentage till completion, and rounded up. The completion percentage shall be determined using formula (6), after determining the actual quantity of work performed.
Completion Percentage =ActualQuantityBudgetedQuantity100
12
 How to solve 4G Il. elearning.ju.edu.jo task, prone to a lot

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!