Question: How will you apply the sensitivity analysis concepts with changing constraints using the appropriate OR techniques on below problem Problem Four automobiles have entered Bubbas
How will you apply the sensitivity analysis concepts with changing constraints using the appropriate OR techniques on below problem
Problem
Four automobiles have entered Bubbas Repair Shop for various types of work, ranging from a transmission overhaul to a brake job. The experience level of the mechanics is quite varied, and Bubba would like to minimize the time required to complete all the jobs. He has estimated the time in minutes for each mechanic to complete each job. Billy can complete job 1 in 400 minutes, job 2 in 90 minutes, job 3 in 60 minutes, and job 4 in 120 minutes. Taylor will finish job 1 in 650 minutes, job 2 in 120 minutes, job 3 in 90 minutes, and job 4 in 180 minutes. Mark will finish job 1 in 480 minutes, job 2 in 120 minutes, job 3 in 80 minutes, and job 4 in 180 minutes. John will complete job 1 in 500 minutes, job 2 in 110 minutes, job 3 in 90 minutes, and job 4 in 150 minutes. Each mechanic should be assigned to just one of these jobs. What is the minimum total time required to finish the four jobs? Who should be assigned to each job?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts