Question: Redo Problem 9.27 with the following: center-to-center spacing of piles = 30 in., length of piles = 45 ft, D = 12 in., c u

Redo Problem 9.27 with the following: center-to-center spacing of piles = 30 in., length of piles = 45 ft, D = 12 in., cu = 860 lb/ft2, and FS = 3. Use Table 9.10.

  

Reference: 1

  

The plan of a group pile is shown in Figure P 9.27. Assume that the piles are embedded in a saturated homogeneous clay having a cu = 90 kN/m2. Given: diameter of piles (D) = 316 mm, center-to-center spacing of piles = 600 mm, and length of piles = 20 m. Find the allowable load-carrying capacity of the pile group. Use Table 9.10 and FS = 3.

  

Reference: 

  

    Redo Problem 9.27 with the following: center-to-center spacing of piles = 30  

  

Reference: 2

  

    in., length of piles = 45 ft, D = 12 in., cu  

Step by Step Solution

3.40 Rating (153 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (2 attachments)

PDF file Icon

60d02c4544dcd_219745.pdf

180 KBs PDF File

Word file Icon

60d02c4544dcd_219745.docx

120 KBs Word File

Students Have Also Explored These Related Civil Engineering Questions!