Question: I also need the upper control limit please with the steps A quality engineer has taken 30 samples over 1 month in a manufacturing company.

I also need the upper control limit please with the steps I also need the upper control limit please with

A quality engineer has taken 30 samples over 1 month in a manufacturing company. Each sample is taken in a separate day and in each sample 60 items are inspected. It was found that 48 items out of 1800 inspected items are faulty. Find the lower control limit of p chart