Question: i have given the answer for the same math with different value not sure if its correct that why i need my maths correct solution

i have given the answer for the same math with different value not sure if its correct that why i need my maths correct solution
thanks in advance
i have given the answer for the same math with
i have given the answer for the same math with
this is the quetion there is no next quetion
1:07 al Done Answer 1 of 1 Anment 13 metime the processes the me shifted left of the center. The proces capability index is found to be there is one that is the current mess than the mean of the current the proces was pretty car procery recent mean that com The party centred on Op Imit the tribution- score the line of the Therefore, torty ZUTU There for a perfectly corredo ZUTU 13 Therefore for a perfectly centre ZIUT) SILTI- Here are on T-24 The total control-3-4 the 2 Now them the Cok wel be there was that the word The ZIL-'C 20LTU 31.04 ZITLE nice, Zip Hea These How to There, there be the comment of the rest of control Charter ch The different between the TL and life und eine prochure 2.0 man ifade open of the proche The distance of the CUTL men 312304 The date of the OUTL en 5.0 ZITU those this answer willes you.de Gyven with prwide. Please provide pool rating that will hematomore questions. Thank you Friend nou Question 1 5 pts A process has a process capability ratio, Cp =1.38. At some time the process seems to have a mean shifted left of the center. The process capability index, ple, is found to be 1.20, and the mean is left-shifted, that is the current mean is mess than the mean of the control chart. Determine the Z (UTL) with respect to the current left-shifted mean

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!