Question: i need a linear programming formulation for this problem plzzzz ASAP Chicago London Rome Tokyo New York MIN Bahama Tong Kong Ker Nigeria Venemaa 1

i need a linear programming formulation for this problem plzzzz ASAP
i need a linear programming formulation for this
i need a linear programming formulation for this
Chicago London Rome Tokyo New York MIN Bahama Tong Kong Ker Nigeria Venemaa 1 Los Angeles 2 6 5 14 4 Distribution Center Mexico City Manila 3 7 10 2 11 4 11 9 4 9 6 12 3 3 3 6 5 2 4 1 3 11 7 6 7 10 4 1 Table (2): Fabric Demands for March (Bolts) Distribution Center Mexico City Manila Fabric London Rome New York Los Angeles 500 1.000 100 Chicago 800 2.000 Cotton Polyester SUK 900 900 Tokyo 200 900 700 SCO 400 400 3.000 200 100 700 1.500 50 100 700 2.500 200 200 Table (3): March Production Capacities (Bolts) MILI Sik Bahamas Hong Kong Korea Nigeria Venezuela Production Capacity Cotton Polyester 1.000 3.000 2.000 2.500 1.000 2000 o 1.000 2000 3500 O 1.000 500 0 o The Worldwide Textile Company, sa Hong Kong-based fimthadits secs de plans are to remain in Hong Kong through the transition in government should the People's Republic of China continue its economic renaissance, the company hopes to its commentare te operations to the mainland Worldwide Textiles in the Bahamas, Hong Kong, Korea, Nigeria and Viewing fabrics out of two or more rowerscotton, polerandori. The ming.com distribution centers located near the customer growceters of actie Because transportation consistorically have been less than 10% of totale palidittle attention to extracting saving through judicious routing of shipments. The manager believes that each year he can save Worldwide Testile hundreds of thousands of dollars styring of fabrics from miste distribution centers Oneclaring example of poor routing is the current augment of fabric output to the Mech distribution center Nigeria instead of from Venerales thanathind the ice Similarly, the Manila center now gets most of its testes from Nigeria and though the mille in Hong Kong itself are much closer Of course the cost of shipping a bolt of cloth does not depend on distance alone. Table (1) provides the actual costs supplied to the manager from company headquarter Districte demands seasonalso a new shipment plan must be made each month Table provides the beginners for the month of March Worldwide Telechave ringes for producing the types of cloth Tablet provides the quantities that apply during March Table (1) Shuane Computador/bok) Table Fabric Demands for March (olta www Tule Tu RES 29 . Table (B. March Production Capacitat The manager wants to schedule production and shipment in such a way that the most are shorted when there is mufficient capacity, and the efficient plants operates Capacity when demand tils below mamum production capacity 1. Find the optimal Mach shipment schedule and total transportations for each of the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!