Question: I need help solving this I don't know how to setup I need formulas and need step by step help. I don't know how to
I need help solving this I don't know how to setup I need formulas and need step by step help. I don't know how to use solver parameters meaning I don't know how to get to it using excel. please help Thanks! Also don't forget range names.

A small firm makes three products (A, B, and C), which all follow the same three-step process consisting of milling, inspection. and drilling. The firm has two inspection lines. Inspection line 1 can process product A and B, while inspection line 2 can process B and C. The following tables show some relevant data: Make a linear programning model in Excel and use Solver to find the best production plan. Requirement: 1. Download the Excel template file, and set up the model based on it. Answer all the questions listed in the file. Exam 2. Question 2.x/sx 2. Please define the appropriate range names to make the Solver configuration more readable. And paste the range names. 3. Run the sensitivity analysis from Solver. Hints: 1. Numbers of production batches are not necessary taking integer. 2. Working time per batch is in minutes, but available working time is in hours. Make sure to convert available hours into available minutes. A small firm makes three products (A, B, and C), which all follow the same three-step process consisting of milling, inspection. and drilling. The firm has two inspection lines. Inspection line 1 can process product A and B, while inspection line 2 can process B and C. The following tables show some relevant data: Make a linear programning model in Excel and use Solver to find the best production plan. Requirement: 1. Download the Excel template file, and set up the model based on it. Answer all the questions listed in the file. Exam 2. Question 2.x/sx 2. Please define the appropriate range names to make the Solver configuration more readable. And paste the range names. 3. Run the sensitivity analysis from Solver. Hints: 1. Numbers of production batches are not necessary taking integer. 2. Working time per batch is in minutes, but available working time is in hours. Make sure to convert available hours into available minutes
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts