Question: Identifying the Bottleneck Since C - D - E and F - G are parallel paths, the bottleneck is determined by the path that has

Identifying the Bottleneck
SinceC - D - EandF - Gare parallel paths, the bottleneck is determined by the path that has thelongest total processing time. This path will determine the overall throughput time of the system because it limits the speed at which the entire process can operate.
TheC D Epath takes35 minutes, whereas theF Gpath takes29 minutes.
Therefore, thebottlenecklies in theC D Epath.
The step with the highest processing time in theC D Epath isD (15 minutes), which makes it a key limiting factor for the entire process.
Conclusion: TheC D Epath is the bottleneck, specifically influenced byStep D (15 minutes), because it has the longest processing time in the parallel paths.
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
With ChatGPTs response, please select the best statement:
Group of answer choices
ChatGPT is right, the cycle time of the process is 15.000 minutes.
ChatGPT is right, the cycle time of the process is 35.000 minutes.
ChatGPT is wrong, the bottleneck steps capacity is 0.100 per minute.
ChatGPT is wrong, because it does not combine the capacity of the two parallel paths (0.129 unites per minute).
Next

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!