Question: Identifying the Bottleneck Since C - D - E and F - G are parallel paths, the bottleneck is determined by the path that has
Identifying the Bottleneck
SinceC D EandF Gare parallel paths, the bottleneck is determined by the path that has thelongest total processing time. This path will determine the overall throughput time of the system because it limits the speed at which the entire process can operate.
TheC D Epath takes minutes, whereas theF Gpath takes minutes.
Therefore, thebottlenecklies in theC D Epath
The step with the highest processing time in theC D Epath isD minutes which makes it a key limiting factor for the entire process.
Conclusion: TheC D Epath is the bottleneck, specifically influenced byStep D minutes because it has the longest processing time in the parallel paths.
With ChatGPTs response, please select the best statement:
Group of answer choices
ChatGPT is right, the cycle time of the process is minutes.
ChatGPT is right, the cycle time of the process is minutes.
ChatGPT is wrong, the bottleneck steps capacity is per minute.
ChatGPT is wrong, because it does not combine the capacity of the two parallel paths unites per minute
Next
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock