Question: If a manager decided to increase both, upper design specification and lower design specification, by the same amount of units (equally), then the process capability
If a manager decided to increase both, upper design specification and lower design specification, by the same amount of units (equally), then the process capability ratio, Cp, ____(i)____, but the process capability index, Cpk for lower design specification ____(ii)_____ and that of upper design specification ____(iii)______.
|
| (i) will increase, (ii) will decrease, (iii) will increase. |
|
| (i) will not change, (ii) will increase, (iii) will decrease. |
|
| (i) will not change, (ii) will decrease, (iii) will increase. |
|
| (i) will increase, (ii) will increase, (iii) will decrease. |