Question: If a project has a negative NPV, then ____. a. the payback period is greater than the length of the project b. the PI is

If a project has a negative NPV, then ____. a. the payback period is greater than the length of the project b. the PI is less than one c. the present value payback period is less than the length of the project d. the payback period is less than the length of the project