Question: If the beam span is 6 ' - 2 for the bridge and there are a total of 5 beam for the bridge the
If the beam span is for the bridge and there are a total of beam for the bridge the bridge is also ft long. The offset for the wood joist is for the false work. How do I calucate how many xx joist I would need to order for the false work