Question: If the ideal cycle time is 1 . 1 min and the repositioning time is 1 min, what is the theoretical minimum number of workstations

If the ideal cycle time is 1.1 min and the repositioning time is 1 min, what is the theoretical minimum number of workstations required to minimize the balance delay under the assumption
that the manning level =1?