Question: If the specification limits are wider than the control limits, then Select one: a. The process is capable b. The process capability index is greater
If the specification limits are wider than the control limits, then Select one: a. The process is capable b. The process capability index is greater than 1.0 c. The specification limits replace the control limits on the chart d. None of the above