Question: ) If there are points on a control chart beyond the control limits but despite this, the process the control chen wacko does not have

) If there are points on a control chart beyond the control limits but despite this, the process the control chen wacko does not have an assignable cause of variation, is the statistical control operator likely to make a, (You are required to know based on what was discussed in class, what the assumed null hypothesis is.) A. Type I Error B. Type II Error 12) If several nearby points on a control chart are above the upper control limit, this is an indication that the procent being tracked is not capable. A. True B. False 13) One way to think about the Coefficient of Determination is that it compares how well of the mean value of the random variable models the data vs how well a particular linear model, models the data. A. True B. False 14) In simple linear regression, the value Bo is always positive or zero. A. True B. False
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
