Question: I'm in exam 24. Using PERT Method, what is the expected duration for an activity with the optimistic duration (minimum)=2, Most likely duration=3, and pessimistic

I'm in exam
24. Using PERT Method, what is the expected duration for an activity with the optimistic duration (minimum)=2, Most likely duration=3, and pessimistic duration(maximum) 4?* (1.5 Points) O 12 O 6 3 o 4 2Step by Step Solution