Question: Important - Please submit your work, including essential diagrams and a written memo: summarizing the problem, the processes undertaken, and the results achieved. Problem #

Important- Please submit your work, including essential diagrams and a written memo: summarizing the problem, the processes undertaken, and the results achieved.
Problem #1: Safety Prediction
Given:
Sufficient information is shown in Figure 1 to establish homogeneous segments for the analysis. The following information is needed to compute the expected number of crashes for each segment:
Average Daily Traffic =4,000 vehicles per day
Number of Lanes =2(one per direction)
Area Type = Urban/Suburban
Lane Width =11 feet
Shoulder Width =4 feet
Shoulder Type is paved
Driveway Density =10 per mile
Roadside hazard rating =4
Find:
The expected number of crashes (one year) along the given roadway.
Problem #2: Speed Consistency Analysis
Given:
The horizontal alignment for a two-lane urban/suburban collector is shown in Figure 1. Other, related information is given above in Problem 1.
Find:
a. Use the passenger car speed prediction models presented in the laboratory to estimate the 85th-percentile operating speed along the alignment, assuming that the posted speed along the alignment is 40 miles per hour. Plot the speed predicted as a function of the longitudinal distance along the roadway.
b. Determine if the alignment produces good, fair, or poor design consistency between each tangent-curve combination, based on the predicted operating speeds
Figure 1. Horizontal Alignment
Important - Please submit your work, including

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!