Question: In a batch machining operation on a conventional machine, setup time is 2 . 5 hours and batch size is 1 0 0 units. The
In a batch machining operation on a conventional machine, setup time is hours and batch size is units. The cyde time consists of part
handing time of and processing time of min. One part is produced each cycle tool changes must be performec every parts and this
takes min. The reliabily of this machine it characterized by mean time between failures of hours and a mean tirfe to repair of min
Deternine
a Average cycle time
b Time to complete the batch
c Average hourly production rate of the machine if avallability is ignored.
d Average hourly production rate of the machine if avaliabily is taken into account.
e Suppose that avaliability only applied during the actual run time of the machine and not the setup time Determine the aver; ge houny production
rate of the machine
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
