Question: In a drum - buffer - rope scheduling system, the drum represents which of the following In a drum - buffer - rope scheduling system,

In a drum-buffer-rope scheduling system, the "drum" represents which of the following
In a drum-buffer-rope scheduling system, the "drum" represents which of the following
The master schedule for the operation.
A safety stock of material.
A drum of jobs to be selected.
The constraint against too much being loaded into the master schedule.