Question: In a LGD factory, one technician needs to run multiple reactors, using the sample route sheet to find out 1) how many reactors you suggest

In a LGD factory, one technician needs to run

In a LGD factory, one technician needs to run
In a LGD factory, one technician needs to run multiple reactors, using the sample route sheet to find out 1) how many reactors you suggest the technician to run, assume: the distance between reactors is 2 minutes away. 2) if operation # D2025 takes 20days (24hr/day), how many reactors you suggest the technician to run? ROUTE SHEET (sample) MY Company: ME427 Product: Lab Grown Diamond (LGD) Part Name: Part No. LGD Rough LGD R20 Prepared by: Date: 2/13/2020 Machine Type Notes Oper. No. D2001 Operation Description Cleaning Tooling Dept. Set-up Time (hr.) GO Operation Time 60 min STIK_20 D2005 Load Seeds STI6K_20 30 min Clean seeds and stage Gloves, Tweezers Seal chamber Rotary pump D2010 Close lid D2015 Draw vacuum Vacuum Chamber STI6K 20 Tweezer/ GO Sucking tube No Go R educe pressure to 1E-9 0 atm MFC 3 channels G 0 15 min 30 min D2020 Inject H2 MFC Pump 60 min D2025 Growth MFC Pump 24 hrs MFC 3 channels G - No Go Hydrogen Gas Tank Inject H2+CH4 Gas/power off STIK_20 10 min D2030 Shut off/inspection D2007 Unload LGD STIK_20 Gloves, Tweezers 30 min Gloves, Tweezers In a LGD factory, one technician needs to run multiple reactors, using the sample route sheet to find out 1) how many reactors you suggest the technician to ruiy, assume: the distance between reactors is 2 minutes away. 2) if operation # D2025 takes 20days (243/day), how many reactors you suggest the technician to run? ROUTE SHEET (sample) Company: ME427 Part Name: LGD Rough Prepared by: MY Product: Lab Grown Diamond (LGD_Part No. LGD R20 Date: 2/13/2020 Machine Type Dept. Set-up Time Notes Oper. No. D2001 Operation Description Cleaning Tooling Operation Time 60 min STI6K_20 Clean seeds and stage D2005 Load Seeds STI6K_20 30 min Gloves, Tweezer Sucking tube No D2010 Close lid D2015 Draw vacuum Vacuum Chamber STI6K_20 15 min 30 min Tweezers Seal chamber Rotary pump Reduce pressure to 1E-9 atm D2020 Inject H2 MFC Pump MFC 3 channels 60 min D2025 Growth MFC Pump MFC 3 channels 24 hrs Hydrogen Gas Tank Inject H2+CH4 Gas/power off STI6K_20 No 10 min D2030 Shut off/inspection D2007 Unload LGD STI6K_20 Gloves, Tweezers 30 min Gloves, Tweezers In a LGD factory, one technician needs to run multiple reactors, using the sample route sheet to find out 1) how many reactors you suggest the technician to run, assume: the distance between reactors is 2 minutes away. 2) if operation # D2025 takes 20days (24hr/day), how many reactors you suggest the technician to run? ROUTE SHEET (sample) MY Company: ME427 Product: Lab Grown Diamond (LGD) Part Name: Part No. LGD Rough LGD R20 Prepared by: Date: 2/13/2020 Machine Type Notes Oper. No. D2001 Operation Description Cleaning Tooling Dept. Set-up Time (hr.) GO Operation Time 60 min STIK_20 D2005 Load Seeds STI6K_20 30 min Clean seeds and stage Gloves, Tweezers Seal chamber Rotary pump D2010 Close lid D2015 Draw vacuum Vacuum Chamber STI6K 20 Tweezer/ GO Sucking tube No Go R educe pressure to 1E-9 0 atm MFC 3 channels G 0 15 min 30 min D2020 Inject H2 MFC Pump 60 min D2025 Growth MFC Pump 24 hrs MFC 3 channels G - No Go Hydrogen Gas Tank Inject H2+CH4 Gas/power off STIK_20 10 min D2030 Shut off/inspection D2007 Unload LGD STIK_20 Gloves, Tweezers 30 min Gloves, Tweezers In a LGD factory, one technician needs to run multiple reactors, using the sample route sheet to find out 1) how many reactors you suggest the technician to ruiy, assume: the distance between reactors is 2 minutes away. 2) if operation # D2025 takes 20days (243/day), how many reactors you suggest the technician to run? ROUTE SHEET (sample) Company: ME427 Part Name: LGD Rough Prepared by: MY Product: Lab Grown Diamond (LGD_Part No. LGD R20 Date: 2/13/2020 Machine Type Dept. Set-up Time Notes Oper. No. D2001 Operation Description Cleaning Tooling Operation Time 60 min STI6K_20 Clean seeds and stage D2005 Load Seeds STI6K_20 30 min Gloves, Tweezer Sucking tube No D2010 Close lid D2015 Draw vacuum Vacuum Chamber STI6K_20 15 min 30 min Tweezers Seal chamber Rotary pump Reduce pressure to 1E-9 atm D2020 Inject H2 MFC Pump MFC 3 channels 60 min D2025 Growth MFC Pump MFC 3 channels 24 hrs Hydrogen Gas Tank Inject H2+CH4 Gas/power off STI6K_20 No 10 min D2030 Shut off/inspection D2007 Unload LGD STI6K_20 Gloves, Tweezers 30 min Gloves, Tweezers

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!