Question: In a mass diagram the LEH for the first loop aligns with 8 2 0 0 cy on the cumulative volume axis and ends at

In a mass diagram the LEH for the first loop aligns with 8200 cy on the cumulative volume axis and ends at station 105+20. The LEH for the second loop aligns with 9500cy on the cumulative volume axis and starts at station 106+05. The mass diagram curve is going up between stations 105+20 and 106+05. Mark all choices that are true about this section of the mass diagram.
There is waste volume of 1300 cy between Sta 105+20 and Sta 106+05
There is a fill section between Sta 105+20 and Sta 106+05
There is fill volume of 1200 cy between Sta 105+20 and Sta 106+05
The waste volume will be excavated for a length of 85 feet
The LEHs for the two loops are a balance line
There is a cut section between Sta 105+20 and Sta 106+05
In a mass diagram the LEH for the first loop

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!