Question: In designing a lean production facility layout a designer should do which of the following?Balance capacity using job shop analysisDesign for work flow balanceLink operations
In designing a lean production facility layout a designer should do which of the following?Balance capacity using job shop analysisDesign for work flow balanceLink operations through a push systemAlways keep operations on a single floor of the factoryLocate flexible workstations off line
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
