Question: in facilites layout (deterministic model for machine fraction ) A certain part (0438) requires three assembly operations (L,M and Q) that are sequentially done on

in facilites layout (deterministic model for machine fraction )
in facilites layout (deterministic model for
in facilites layout (deterministic model for
A certain part (0438) requires three assembly operations (L,M and Q) that are sequentially done on an automatic assembly line. The schedule designer requires this assembly line to produce 6000 parts/month, and the plant will be operating 4 weeks per month, six days per week, and 8 hours per day. The following information is known: The line is controlled by a computer that requires re-programing every lot of 750 parts. This re-programing process takes I hour on average. The available time in(hours) at operation (M) for producing the required quantity is: 1) 48 2)182 3)168

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!