Question: In recent months, several quality problems have resulted from apparent changes in design specifications by engineering, including material substitutions. This has only come to light

In recent months, several quality problems have resulted from apparent changes in design specifications by engineering, including material substitutions. This has only come to light through quality engineerings failure analysis system. Which of the following quality system provisions should be recommended as the best corrective action?
Group of answer choices
Establishing a formal procedure for initial design review
Establishing a formal procedure for specification change control
Establishing a formal system for drawing and print control
Establishing a formal material review (MRB) system

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!