In the food production facility where you work, cold and hot water supply to the newly built
Question:
In the food production facility where you work, cold and hot water supply to the newly built 2nd floor of the factory. pipelines must be laid. Hot water, hot water in the basement of the factory from the boiler and cold water is supplied from the city water network. Hence, the hot water basement from the ground floor, the cold water comes from the city mains water inlet line at the factory entrance on the ground floor. will be provided. Hot and cold pipelines are in the form of two separate lines. It will reach 3 taps positioned 10 meters apart from each other on the floor.
At the faucet inlet, the lines converge and provide optional hot, cold or a mixture of both. will be set to flow. Make the pipeline design for the described situation and make detailed
Give your drawing (flow chart) as follows. For this, you can use your own design and drawing. the horizontal and vertical distances to be covered by the water, the water flow rates from the tap, the water temperatures, types and properties of pipes, turns of pipes, all connection
elements, friction losses, etc. You need to add it to your account. All your acceptances Explain in detail with reasons.
a. Make the necessary calculations in detail on your design. and calculate the required pump power (kW).
b. Make a market research and choose the right pump for your system. Pump Select the pump that needs to be purchased using the efficiency information. you made detailed information about the research (brand, screenshot, catalog photo) etc.)