Question: In the Protocol Execution IQ-0001 for Formulation Tank for Manufacturing Area, makes a test for Electrical Connection, Compress Air and Water Flow. To verify this
In the Protocol Execution IQ-0001 for Formulation Tank for Manufacturing Area, makes a test for Electrical Connection, Compress Air and Water Flow. To verify this test the Validation Engineer used different method with Voltmeter and Flow Meter. During the Protocol execution have incident regarding not have connection to make a test for electrical connections. * It should address the following areas for Validation Report: > Title > Purpose - Background > References - Deviation from protocol > Test equipment > Test methods - Test results - Data analysis > Conclusion - Appendix