Question: In the T-shirt manufacturing systems, the four workstations have different cycle times. If we operate these four workstations with a conveyor, we need to

In the T-shirt manufacturing systems, the four workstations have different cycle times.

In the T-shirt manufacturing systems, the four workstations have different cycle times. If we operate these four workstations with a conveyor, we need to add a buffer as shown in the follows: Balance the Production Line You may need to consider a way to balance your production line, as shown in Exhibit 2. The bottleneck of the production line is section two. Exhibit 2 The production line of the manufacturing of a T-shirt [ Analyze the critical procedure of your manufacturing system and find out the bottleneck and design a buffer to balance your production line if necessary. How could we evaluate the performance of the material handling of the procedure?

Step by Step Solution

3.37 Rating (147 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!