Question: # In this scenario you are the responsible engineer that optimize a traffic flow of highway. # This highway works 24 hrs a day and
# In this scenario you are the responsible engineer that optimize a traffic flow of highway. # This highway works 24 hrs a day and each hour, number cars passed varies # between 3000 and 4000. However, if an accident occurs in the highway, number of cars passing # recorded between 500 and 1000. In this badly designed highway (it has not designed by an engineer) # possibility of causing accidents observed as 0.5 (%50). Calculate q1, q2, q3, mean and stdev # of produced products every day for a month.
(Use Python, Thank you..)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
