Question: Industrial Cost Control IET 350 Assignment 2 Total (100 points: scale down to 20 points) 1. Definition: time study (5 points) (Gi) In time study,
Industrial Cost Control IET 350 Assignment 2 Total (100 points: scale down to 20 points) 1. Definition: time study (5 points) (Gi) In time study, how to obtain Normal Time' (ii) In time study, how to obtain Standard Time ii) What is Snap-Back method? (iv) What is PF& D (Personal, Fatigue & Delay) factor, why it is important? (v) What are the general allowances for each of these factors? Personal allowance ( Fatigue allowance averages up to ) Delay allowance typically ranges )